All rights reserved. All illustrations are by WERNER WOHNBAU. All images, representations and photos are sample images; these may differ from the house type and contain special equipment.
The topsoil in the building area has been removed in both construction phases (WEG 1 and 2), and the formation level has been completed in preparation for the vibro-compaction piles.